« demolition continues | Main | Post holes »

Noooooooooooooooooo!

The city is trying to mess with my plans for a fabulous hot tubbing life. Our deck permit went through without the hot tub. We have to hire an engineer to make the plans official for the weight of the hot tub in our "seismic zone D" neighborhood. Geesh.

Its all cleaned out and ready for post holes! Our dog keeps running for the stairs that are no longer there. Hilarious!

Img 1153Sm

My little hen mama is sitting on the eggs still with 11 days to go. I know a lot of them are no good but hopefully one or two babies will hatch.

Img 1156Sm

Post a comment


About

This page contains a single entry from the blog posted on June 10, 2008 3:56 PM.

The previous post in this blog was demolition continues.

The next post in this blog is Post holes.

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type 3.35